INTEGRATED FRAMEWORK
HOME NEWS & EVENTS PARTNERS DOCUMENTS SEARCH
  Home > Central African Republic Français    

Implementation

Central African Republic

The preparatory mission took place in March 2006. The main findings of this mission were incorporated in an Aide-mémoire. A concept paper was prepared upon completion of the preparatory mission.

The main mission took place in June/July 2006, after which aide-mémoires were prepared, summarizing the outcome of the mission.

The draft DTIS was completed in April 2007. A national workshop was held in November 2007.

The DTIS results and recommendations, which were discussed in September 2007 during a donor roundtable meeting for CAR, have been included in the PRSP.

 

IF Focal Point Ms. Sabine Beret
Administrateur Civil, Point Focal CI
Service des études
Ministère du Commerce
B.P. 1988
Bangui, CAR
Tel: +236 75 05 18 50
IF Donor Facilitator European Commission
Avenue Barthélemy Boganda
B.P. 1298
Bangui
Tel.: +236 21 61 30 53
Fax: +236 21 61 65 35
www.delrca.ec.europa.eu

Section Intégration Régionale:

Mr. Patrick Berckmans
Chef de Section

Mr. Briac Deffobis
Chargé de Programme Intégration Régionale
Cell: +236 75 20 29 27/ 75 20 41 84
World Bank Contact Mr. Luc Razafimandimby
Tel.: +1 202 458 9539
Fax: +1 202 522 0050
UNDP Contact PNUD
Avenue Boganda
BP : 872
Bangui
Tel. : +236 61 19 77
Fax : +236 61 17 32

Mr. Youssoufa Silla
Chargé de Programme
Réduction de la Pauvreté
Cell: +236 75 50 89 01
Aide-Mémoire Preparatory mission (pdf - 22k) (French)
Main mission (pdf - 93k) (French)
Concept Paper Concept paper (pdf - 173k)
Diagnostic Trade Integration Study  
Action Matrix Action Matrix (pdf - 123k) (French)
Date of Workshop  
Implementation Meeting  
Approved Window II Projects  
Monitoring Matrix  
EIF Correspondence In-country preparations for the EIF (pdf - 37k)

Page last updated on 31 August 2009