To lay the groundwork for the DTIS and the IF process, a preliminary mission took place from June 21-30, 2004. Participants included the mission leader and representatives of IF agencies.

Based on the findings of this mission, a concept paper was prepared, outlining the main areas to be covered in the DTIS.

The main mission took place in November 2004. The DTIS team leader visited Rwanda in March for exchanges with the Rwandese authorities on the DTIS preliminary findings. Many follow-up exchanges took place between the DTIS team and local consultants and the government.

Upon completion of the DTIS, the National Validation Workshop took place in September 2005. An aide-mémoire was prepared after the workshop. The outcome of the workshop was incorporated in the final version of the DTIS.

The Ministry of Commerce prepared an overview document including a table of actions (pdf - 117k) summarizing the actions which took place after the National Workshop.

Trade issues (regional integration, AGOA, tariff reform, transport, export promotion, EPZ) were covered in the June 2002 PRSP.

One Window II project was launched: capacity building at the Ministry of Trade.

UK (DFID) is the IF Facilitator for Rwanda.

 

IF Focal Point Mr. Antoine Ruwebana
Secretary General
Ministry of Commerce

Mr. Emile Fundira
IF Coordinator
Ministry of Commerce
Cell: + 250 08 30 74 02
IF Donor Facilitator Mr. Andrew Masters, DFID
Ms. Suzanne Parkin, DFID, London
World Bank Contact Ms. Mireille Linjouom
UNDP Contact Mr. Jean-Paul Rwabuyonza
National Economist and Head of SPEMU
P.O. Box 445, Kigali, Rwanda
Tel.: +250 59 04 12
Cell: +250 08 43 51 10
Fax: +250 57 62 63
Aide Mémoire Aide-Mémoire National Workshop (pdf - 14k)
Concept Paper Concept Paper (pdf - 72k)
Diagnostic Trade Integration Study DTIs (pdf - 849k)
Action Matrix Action Matrix (pdf - 35k)
Date of Workshop September 13, 2005
Implementation Meeting  
Approved Window II Projects  
Monitoring Matrix  
EIF Correspondence In-country preparations for the EIF

 

 

Page last updated on 20 May 2008