Tanzania
In July 2004, the DTIS team leader visited Dar Es Salaam to discuss
with the authorities a number of modalities for the Tanzania Diagnostic
Trade Integration Study (DTIS). The mission met with staff in the
Ministry of Industry and Trade (MIT), representatives from the private
sector and the donor community, and researchers and consultants
involved in trade-related work.
The main findings of this mission were summarized in an Aide-Mémoire.
A concept paper was prepared prior to the main mission, which took
place in November 2004.
The National Validation Workshop took place in November 2005. The
results of this workshop were incorporated in the final version
of the DTIS.
A consultant was hired to assist the government during the
implementation process. Discussions are under way on the identification
of appropriate implementation structures and mechanisms, including
setting up a multi-donor basket fund to support DTIS implementation.
A number of trade issues were included in the June 2005 PRSP.
The IF Facilitator for Tanzania is Sweden.
| IF Focal Point |
Mr.
Edward Mathew Sungula
A/Head, Multilateral Section
Ministry of Industry, Trade and Marketing
Tel.: +255-22-212-7897/8
Cell: +255-754-529-703
Fax: +255-22-212-5832 |
| IF Donor Facilitator |
Mr. Love Theodossiadis
Private Sector Development - Trade
Embassy of Sweden - Dar es Salaam
Swedish International Development Cooperation Agency (Sida)
Tel.: +255 22 21 96 535
Fax: +255 22 21 96 503
Visiting address : Mirambo Street/Garden Avenue
Mr. Patrik Zimmerli
Programme Officer/ Commercial Attaché
Swiss Cooperation Office Tanzania
Embassy of Switzerland
79, Kinondoni Road
P.O. Box 23371
Dar es Salaam
Tel. +255 22 266 62 20
Fax. +255 22 266 63 73
Mob. +255 76 358 92 04 |
| World Bank Contact |
Ms. Sumana Dhar
Regional Trade Coordinator
East Africa and Horn of Africa
Tel.: +1 202 473 8084
Fax: +1 202 473 8262 |
| UNDP Contact |
Mr. Ernest Salla |
| Aide-Mémoire |
Aide-Mémoire (pdf - 12k) |
| Concept Paper |
Concept
Paper (pdf - 160k) |
| Diagnostic Trade Integration
Study |
Volume
1 (pdf - 1.6mb)
Volume
2 (pdf - 996k) |
| Action Matrix |
Action
Matrix (pdf - 104k) |
| Date of Workshop |
7-8 November 2005 |
| Implementation Meeting |
|
| Approved Window II Projects |
|
| Monitoring Matrix |
|
| EIF Correspondence |
In-country preparations for the EIF (pdf - 35k) |
 |
|
Page last updated on