
Uganda
The preparatory mission took place in May 2005. Its main findings
were incorporated in an aide-mémoire. Based on these findings, a concept
note was prepared and reviewed by the World Bank and the IF Working
Group. The main mission was fielded in July 2005, after which the
draft DTIS was prepared.
Regional trade issues, trade
facilitation, product standards/SPS, export promotion and ITC trade
issues were included in the May 2005 PRSP.
The National Validation Workshop, during which the draft DTIS was
discussed, took place in October 2006. After the workshop, an aide-mémoire was prepared, describing the envisaged implementation and
follow-up process.
The DTIS was validated in October 2006.
Window II projects are under preparation.
| IF Focal Point |
Mr.
Peter Elimu Elyetu
Senior Foreign Trade Officer
Ministry
of Tourism, Trade and Industry
Farmers House, Parliament Avenue
P.O Box 7103, Kampala, Uganda
Tel.: +256 41 34 39 47/ +256 41 25 63 95
Fax: +256 41 34 72 86
Mr. H.G.K. Nyakoojo
Coordinator |
| IF Donor Facilitator |
Mr. Vincent de Visscher
Ambassador and Head of Delegation
European Commission
Crested Towers, 15th floor
Plot 17-23 Hannington Road
P.O. Box 5244
Kampala
Tel.: +256 41 4 701 000
Fax: +256 41 4 233 708
www.deluga.ec.europa.eu |
| World Bank Contact |
Ms. Sumana Dhar
Regional Trade Coordinator
East Africa and Horn of Africa
Tel.: +1 202 473 8084
Fax: +1 202 473 8262 |
| UNDP Contact |
Mr. Wilson Kwamya |
| Aide-Mémoire |
Preparatory
mission (pdf - 29k)
Post-validation
workshop (pdf - 24k) |
| Concept Paper |
Concept paper (pdf - 147k) |
| Diagnostic Trade Integration
Study |
Volume
1 (pdf - 1.5m)
Volume
2 (pdf - 1.1m)
(version discussed during National Validation Workshop) |
| Action Matrix |
Action
Matrix (pdf - 102k) |
| Date of Workshop |
October 2006 |
| Implementation Meeting |
|
| Approved Window II Projects |
|
| Monitoring Matrix |
|
| EIF Correspondence |
In-country preparations for the EIF (pdf - 38k) |
 |
|
Page last updated on
25 May 2009
|