Uganda
The preparatory mission took place in May 2005. Its main findings
were incorporated in an aide-mémoire. Based on these findings, a concept
note was prepared and reviewed by the World Bank and the IF Working
Group. The main mission was fielded in July 2005, after which the
draft DTIS was prepared.
Regional trade issues, trade
facilitation, product standards/SPS, export promotion and ITC trade
issues were included in the May 2005 PRSP.
The National Validation Workshop, during which the draft DTIS was
discussed, took place in October 2006. After the workshop, an aide-mémoire was prepared, describing the envisaged implementation and
follow-up process.
The DTIS was validated in October 2006.
Window II projects are under preparation.
Page last updated on
20 May 2008
|