INTEGRATED FRAMEWORK
HOME NEWS & EVENTS PARTNERS DOCUMENTS SEARCH
  Home > Uganda Français    

IF Countries

Uganda

The preparatory mission took place in May 2005. Its main findings were incorporated in an aide-mémoire. Based on these findings, a concept note was prepared and reviewed by the World Bank and the IF Working Group. The main mission was fielded in July 2005, after which the draft DTIS was prepared.

Regional trade issues, trade facilitation, product standards/SPS, export promotion and ITC trade issues were included in the May 2005 PRSP.

The National Validation Workshop, during which the draft DTIS was discussed, took place in October 2006. After the workshop, an aide-mémoire was prepared, describing the envisaged implementation and follow-up process.

The DTIS was validated in October 2006.

Window II projects are under preparation.

 

IF Focal Point Mr. Peter Elimu Elyetu
Senior Foreign Trade Officer
Ministry of Tourism, Trade and Industry
Farmers House, Parliament Avenue
P.O Box 7103, Kampala, Uganda
Tel.: +256 41 34 39 47/ +256 41 25 63 95
Fax: +256 41 34 72 86

Mr. H.G.K. Nyakoojo
Coordinator
IF Donor Facilitator Mr. Vincent de Visscher
Ambassador and Head of Delegation
European Commission
Crested Towers, 15th floor
Plot 17-23 Hannington Road
P.O. Box 5244
Kampala
Tel.: +256 41 4 701 000
Fax: +256 41 4 233 708
www.deluga.ec.europa.eu
World Bank Contact Ms. Sumana Dhar
Regional Trade Coordinator
East Africa and Horn of Africa
Tel.: +1 202 473 8084
Fax: +1 202 473 8262
UNDP Contact Mr. Wilson Kwamya
Aide-Mémoire Preparatory mission (pdf - 29k)
Post-validation workshop (pdf - 24k)
Concept Paper Concept paper (pdf - 147k)
Diagnostic Trade Integration Study Volume 1 (pdf - 1.5m)
Volume 2 (pdf - 1.1m)
(version discussed during National Validation Workshop)
Action Matrix Action Matrix (pdf - 102k)
Date of Workshop October 2006
Implementation Meeting  
Approved Window II Projects  
Monitoring Matrix  
EIF Correspondence In-country preparations for the EIF (pdf - 38k)

Page last updated on 25 May 2009